Anglo Eastern Pulp frames
Liftal received a request to inspect and test frames using unloading pulp packs and wood. The equipment was located on board of the SAGA VIKING and could only be made available for a very short period of time owing to the tight schedule.
Liftal inspected the 4 frames within 24 hours using an extensive arsenal of chains and pneumatically powered hooks. The equipment was back on board within the agreed time for immediate deployment.